違法信息舉報 客服熱線:400-118-7898
廣告
?
專接本欄目測試廣告

?2016年11月北京自考學位英語真題

自考 責任編輯:訚星楚 2020-03-12

摘要:北京歷年自考學位英語真題在哪找?許多考生對于北京地區(qū)自考學位英語真題及答案的需求非常大,希賽網特別整理了2016年11月北京自考學位英語真題,希望能夠幫助到各位考生。(參考答案在題目后面)

2016年11月北京自考學位英語真題

Passage 1

If Dakota Access Pipeline (輸油管道) completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP), a Texas-based company behind the $3. 8 billion project hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe (部落), is determined to stop the 1,172-mile pipeline from being built. (76) Both sides show no signs of backing down.

The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from other American Indian tribes, have traveled to the side to join the protest.

ETP says that the pipeline will have built-in measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (閥) within three minutes if leaks are detected.

American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.

(77) Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction.

1. Which of the following is the main idea of the passage?

A. The Dakota Access Pipeline will create more markets for oil and gas.

B. The Dakota Access Pipeline will create many job opportunities.

C. American Indians oppose the construction of an oil pipeline.

D. American Indians fight for equal voting rights.

2. ETP hopes to finish this project in _____.

A. 2016 B. 2017 C. 2018 D. 2019

3. Why do American Indians protect against the construction of this pipeline?

A. Because it will cost up to $3.8 billion.

B. Because it threatens the region’s water supply.

C. Because it will make many people lose their jobs.

D. Because it will force many people to leave their homes.

4. According to the passage, the workers can _____ in case of pipeline leaks.

A. report to the local government B. ask people to leave the leak affected areas

C. call 911 D. close valves

5. According to the passage, which of the following statements is NOT TRUE?

A. This pipeline will cross four states.

B. This pipeline is 1,172 miles long.

C. All the protesters are from the Standing Rock Sioux.

D. Neither sides of the dispute is willing to compromise.

相關文章:

2020年各省自考學士學位英語報名考試時間及入口匯總

2020年各省市自考本科學士學位英語考試時間匯總

2020各省自考學位英語考試題型匯總

為什么有人說自考學位根本沒用?

溫馨提示:因考試政策、內容不斷變化與調整,本網站提供的以上信息僅供參考,如有異議,請考生以權威部門公布的內容為準!

自考備考資料免費領取

去領取